Wednesday, February 22, 2012
 
  • Integrity
  • Innovation
  • Experience

Connect with us

Sound Mining Solution

DavWal Square
2A Fifth Avenue
Rivonia
2128

Tel: + 27(0)11 234 7152
Fax: + 27(0)11 234 8912

Basic Phases and Design Process

Basic Phases and Design

Concept Studies: 4 to 8 weeks
 Is the business case or thinking right?

Prefeasibility Studies: 6 to 8 months
 Are the correct choices made?

Feasibility Studies: 4 to 6 months
 Are the cost estimates correct?

The Basic Design Process

  1. Geological model
  2. Design Criteria
  3. Design and Schedule
  4. Costing
  5. Financial Modelling
  6. Reporting 
Copyright 2010 Sound Mining Solution (Pty) Ltd